During-production or pre-shipment inspection: choosing a stage

Start with the decision. If there is still time to correct process problems, discuss a during-production check. If the decision concerns a prepared shipment, confirm the conditions for a pre-shipment check. Both stages may be useful; an earlier check cannot establish the condition of every item produced later.

Updated: 2026-10-09

Decision and evidence checklist

Buying situationArrangement to considerEvidence and conditions before booking
New product, process or supplierDiscuss early or during-production checks, then a risk-based pre-shipment checkSpecification revision, approved sample, critical processes and production/packing schedule
Production is running and correction remains possibleDuring-production check of agreed work in progress, output and processesAvailable quantities, sample population, rework window and follow-up method
Goods are ready for shipment assessmentPre-shipment check against the agreed lot and requirementsActual completed and packed quantities, model mix, sample access and test conditions
Concern is loading the wrong goods or quantitiesAgree a separate container loading supervision scopeLoading list, product identification, container condition and seal records
A critical requirement needs laboratory evidenceArrange applicable testing and a sample plan separatelyDestination market, requirements, test methods and traceable samples

How to use the checklist

  1. Turn the main risks into checkable requirements, such as measurement tolerances, a functional method or a packaging revision.
  2. Confirm actual readiness with the factory before agreeing a visit date. Set project-specific readiness conditions; do not treat one completion percentage as universal.
  3. Agree who decides on correction, reinspection or delay and reserve time to verify corrective work.

Project discussion record

This is a general purchasing worksheet, not an actual customer report or a completed project result. Blank records are for the project parties to complete. Agreed project scope, acceptance criteria and decision authority govern the work.

Project/order: ____  Model/lot: ____  Requirement and revision: ____
Evidence received: ____  Open item: ____  Owner: ____
Due date: ____  Verification method: ____  Decision owner/date: ____

Confirm before booking

Provide the product and models, factory location, quantities, current progress, target date, acceptance requirements and report language. TTSQC confirms executable scope, staffing, fees and delivery timing for the specific project. Inspection, laboratory testing, certification and factory audits require separate scope confirmation.