TTSQC / Services / Product Inspection

During-production Inspection

Detect systematic deviations during production and verify whether corrective action can be completed before shipment.

Start a request
Process illustrationDuring-production Inspection
Requirements
Evidence
Results

Connect requirements, field checks and traceable evidence.

Product Inspection

When it fits

Best for long cycles, large volumes, complex processes, tight lead times or early risks that require follow-up.

Let AI guide me →
Process illustrationDuring-production Inspection
Requirements
Evidence
Results

Connect requirements, field checks and traceable evidence.

CONTROL POINTS

Core checks

Four verifiable control points explain the objective.

Record dimensional measurementsCheck pointsDuring-production Inspection
01

Actual completion against plan

02

Workmanship of work-in-process and finished units

03

Critical dimensions, functions and process parameters

04

Findings, rework scope and corrective progress

Record dimensional measurements · Field photos from previous reports

REFERENCE FRAMEWORK

Match requirements, evidence and results

The applicable standard, regulation edition and route are confirmed against the product, target market and technical review at project start.

All reference requirements
  • Client specification, order and production plan
  • Approved sample and previous findings
  • Agreed sampling and testing requirements
RequirementsAgree specifications & requirements
EvidenceKeep method-bound records
ResultsProfessional review

Process illustration

HOW IT WORKS

See the service in five steps

  1. 01

    Verify files

  2. 02

    Confirm sampling

  3. 03

    Inspect on site

  4. 04

    Verify packing

  5. 05

    Compile report

Read the complete explanation
  • Verify order files and available quantity
  • Sample to AQL or client plan
  • Check workmanship, measurements, functions and safety items
  • Verify packaging, carton marks, labels and barcodes
  • Bind photos to steps and form the result

WHAT TO PREPARE

Bring these files together

Start with what you have; a manager will confirm any gaps.

  • PO/PI and quantity data
  • Specifications, drawings or BOM
  • Packaging, label and barcode files
Full document checklist
  • PO/PI and quantity data
  • Specifications, drawings or BOM
  • Packaging, label and barcode files
  • Approved sample or reference photos
  • Client-specific requirements

Your files are used only to assess and process this service request.

Basic information
Technical scope
Existing files
Share files

WHAT YOU RECEIVE

See what you receive

Anonymised inspection report example
Anonymised inspection report example
Follow orders and files in your portal · Actual system interface · synthetic demo data
Follow orders and files in your portal · Actual system interface · synthetic demo data

A previous inspection report; deliverables depend on the agreed service.

Complete deliverables
  • Confirmed scope and document gaps
  • Structured check data and step-bound photos
  • Risks and points requiring human confirmation
  • Reviewed formal report or technical deliverable
Actual system interface · synthetic demo data
Actual system interface · synthetic demo data

AI SUPPORT

Turn the report into next steps

AI helps organise and explain; professionals confirm field facts and formal conclusions.

Read the complete explanation

AI extracts fields, prepares checks, flags missing field evidence and compares the request, instruction, data, photos and report.

Human accountability

AI does not change field facts, decide the final verdict or replace professional approval.

FAQ

Frequently asked questions

Can I request service with incomplete information?

Yes. Share the product, market, date and risks you know. The service manager will identify gaps; unconfirmed information is never converted into a field fact.

Does AI issue the final conclusion?

No. AI organises files, finds contradictions and flags missing evidence. Relevant professionals own field facts and final technical decisions.

When will the plan be confirmed?

Normally within one business day after sufficient information is available. Testing and certification timing depends on the exact project.

Tell us the product and target market. The right workflow will take it from there.

Start a request