Product inspection — SCHEMATIC. Check the product. Before production → During production → Before shipment.
Schematic illustration. It shows a check path, not actual project evidence or a compliance result.

Read the diagram

  1. Before production

    Review agreed inputs and readiness before work begins.

  2. During production

    Observe relevant product and process conditions during production.

  3. Before shipment

    Check the available lot and evidence before the shipment decision.

IPC = initial check at 10-20% production. DUPRO = during production at 30-60%. FRI = final random inspection at 80-100%. Learn when each stage delivers maximum value.

Use note

Articles support understanding of quality risk, standards and service routes. Formal requirements depend on the product, target market and technical project confirmation.